Housing Delivery Test Checker

The Housing Delivery Test (HDT) measures the supply of new housing development in each English local authority area. The purpose of the HDT is to hold local authorities to account over the supply of new housing, by placing sanctions on those local planning authorities where the supply of new housing has been poor.

Where the HDT measurement for an area falls below certain thresholds the policies of the Development Plan, including Neighbourhood Plans and Local Plans can be rendered out-of-date - explained in my post How the Housing Delivery Test can affect Neighbourhood Plans.

To view the 2018 Housing Delivery Test Measurement, and the consequences of the result, select an area from the drop-down menu.


Adur - HDT result

Adur required 531 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 216.6 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 41%.

Consequences

Based on the 2018 HDT measurement, the local planning authority must apply a 20% buffer when calculating Five Year Land Supply, and should prepare an action plan to assess the causes of under-delivery and identify actions to increase delivery in future years.

Allerdale - HDT result

Allerdale required 365.3 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 1014 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 278%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Amber Valley - HDT result

Amber Valley required 1136.1 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 1648 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 145%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Arun - HDT result

Arun required 2423.2 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 2213.6 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 91%.

Consequences

Based on the 2018 HDT measurement, the local planning authority should prepare an action plan to assess the causes of under-delivery and identify actions to increase delivery in future years.

Ashfield - HDT result

Ashfield required 1333.7 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 1543.9 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 116.%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Ashford - HDT result

Ashford required 2135.8 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 2347.3 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 110%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Aylesbury Vale - HDT result

Aylesbury Vale required 2958.8 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 3928 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 133%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Babergh - HDT result

Babergh required 812.2 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 714 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 88%.

Consequences

Based on the 2018 HDT measurement, the local planning authority should prepare an action plan to assess the causes of under-delivery and identify actions to increase delivery in future years.

Barking and Dagenham - HDT result

Barking and Dagenham required 3694 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 1578.7 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 43%.

Consequences

Based on the 2018 HDT measurement, the local planning authority must apply a 20% buffer when calculating Five Year Land Supply, and should prepare an action plan to assess the causes of under-delivery and identify actions to increase delivery in future years.

Barnet - HDT result

Barnet required 6547 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 5385.5 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 82%.

Consequences

Based on the 2018 HDT measurement, the local planning authority must apply a 20% buffer when calculating Five Year Land Supply, and should prepare an action plan to assess the causes of under-delivery and identify actions to increase delivery in future years.

Barnsley - HDT result

Barnsley required 2480.1 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 2565 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 103%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Barrow-in-Furness - HDT result

Barrow-in-Furness required 0 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 300.2 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is Not Applicable.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Basildon - HDT result

Basildon required 2089.4 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 1569 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 75%.

Consequences

Based on the 2018 HDT measurement, the local planning authority must apply a 20% buffer when calculating Five Year Land Supply, and should prepare an action plan to assess the causes of under-delivery and identify actions to increase delivery in future years.

Basingstoke and Deane - HDT result

Basingstoke and Deane required 2453.4 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 1854 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 76%.

Consequences

Based on the 2018 HDT measurement, the local planning authority must apply a 20% buffer when calculating Five Year Land Supply, and should prepare an action plan to assess the causes of under-delivery and identify actions to increase delivery in future years.

Bassetlaw - HDT result

Bassetlaw required 954.7 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 1348.2 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 141%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Bath and North East Somerset - HDT result

Bath and North East Somerset required 1340.4 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 3583.8 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 267%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Bedford - HDT result

Bedford required 2783.9 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 3589.6 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 129%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Bexley - HDT result

Bexley required 1127.6 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 1002.3 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 89%.

Consequences

Based on the 2018 HDT measurement, the local planning authority should prepare an action plan to assess the causes of under-delivery and identify actions to increase delivery in future years.

Birmingham - HDT result

Birmingham required 7500 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 8119.4 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 108%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Blaby - HDT result

Blaby required 812 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 2064 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 254%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Blackburn with Darwen - HDT result

Blackburn with Darwen required 716.5 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 513 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 72%.

Consequences

Based on the 2018 HDT measurement, the local planning authority must apply a 20% buffer when calculating Five Year Land Supply, and should prepare an action plan to assess the causes of under-delivery and identify actions to increase delivery in future years.

Blackpool - HDT result

Blackpool required 406.5 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 406.7 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 100%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Bolsover - HDT result

Bolsover required 666.4 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 870 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 131%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Bolton - HDT result

Bolton required 2421.9 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 1447.6 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 60%.

Consequences

Based on the 2018 HDT measurement, the local planning authority must apply a 20% buffer when calculating Five Year Land Supply, and should prepare an action plan to assess the causes of under-delivery and identify actions to increase delivery in future years.

Boston - HDT result

Boston required 787.5 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 858.9 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 109.%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Bournemouth - HDT result

Bournemouth required 2352.9 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 1970.1 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 84%.

Consequences

Based on the 2018 HDT measurement, the local planning authority must apply a 20% buffer when calculating Five Year Land Supply, and should prepare an action plan to assess the causes of under-delivery and identify actions to increase delivery in future years.

Bracknell Forest - HDT result

Bracknell Forest required 1614.1 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 1202.9 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 75%.

Consequences

Based on the 2018 HDT measurement, the local planning authority must apply a 20% buffer when calculating Five Year Land Supply, and should prepare an action plan to assess the causes of under-delivery and identify actions to increase delivery in future years.

Bradford - HDT result

Bradford required 5304.6 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 4037.1 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 76%.

Consequences

Based on the 2018 HDT measurement, the local planning authority must apply a 20% buffer when calculating Five Year Land Supply, and should prepare an action plan to assess the causes of under-delivery and identify actions to increase delivery in future years.

Braintree - HDT result

Braintree required 1416 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 1310.6 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 93%.

Consequences

Based on the 2018 HDT measurement, the local planning authority should prepare an action plan to assess the causes of under-delivery and identify actions to increase delivery in future years.

Breckland - HDT result

Breckland required 1635.9 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 1940 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 119%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Brent - HDT result

Brent required 4456.6 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 4379.4 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 98%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Brentwood - HDT result

Brentwood required 932.5 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 474 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 51%.

Consequences

Based on the 2018 HDT measurement, the local planning authority must apply a 20% buffer when calculating Five Year Land Supply, and should prepare an action plan to assess the causes of under-delivery and identify actions to increase delivery in future years.

Brighton and Hove - HDT result

Brighton and Hove required 1965 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 1509 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 77%.

Consequences

Based on the 2018 HDT measurement, the local planning authority must apply a 20% buffer when calculating Five Year Land Supply, and should prepare an action plan to assess the causes of under-delivery and identify actions to increase delivery in future years.

Bristol, City of - HDT result

Bristol, City of required 5233.9 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 5200 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 99%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Broadland (Broadland; Norwich; South Norfolk joint plan area) - HDT result

Broadland (Broadland; Norwich; South Norfolk joint plan area) required 5002.7 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 6657.6 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 133%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Bromley - HDT result

Bromley required 1923 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 2120.3 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 110.%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Bromsgrove - HDT result

Bromsgrove required 1375.6 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 1287 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 94%.

Consequences

Based on the 2018 HDT measurement, the local planning authority should prepare an action plan to assess the causes of under-delivery and identify actions to increase delivery in future years.

Broxbourne - HDT result

Broxbourne required 1151.4 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 766.7 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 67%.

Consequences

Based on the 2018 HDT measurement, the local planning authority must apply a 20% buffer when calculating Five Year Land Supply, and should prepare an action plan to assess the causes of under-delivery and identify actions to increase delivery in future years.

Broxtowe - HDT result

Broxtowe required 1039.7 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 700 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 67%.

Consequences

Based on the 2018 HDT measurement, the local planning authority must apply a 20% buffer when calculating Five Year Land Supply, and should prepare an action plan to assess the causes of under-delivery and identify actions to increase delivery in future years.

Burnley - HDT result

Burnley required 191.6 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 744 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 388%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Bury - HDT result

Bury required 1635.1 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 980.2 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 60%.

Consequences

Based on the 2018 HDT measurement, the local planning authority must apply a 20% buffer when calculating Five Year Land Supply, and should prepare an action plan to assess the causes of under-delivery and identify actions to increase delivery in future years.

Calderdale - HDT result

Calderdale required 2473.3 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 898.7 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 36%.

Consequences

Based on the 2018 HDT measurement, the local planning authority must apply a 20% buffer when calculating Five Year Land Supply, and should prepare an action plan to assess the causes of under-delivery and identify actions to increase delivery in future years.

Cambridge - HDT result

Cambridge required 1017.5 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 3943 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 388%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Camden - HDT result

Camden required 3084.3 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 3263.1 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 106%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Cannock Chase - HDT result

Cannock Chase required 721.7 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 993.2 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 138%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Canterbury - HDT result

Canterbury required 1875.2 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 2201.8 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 117%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Carlisle - HDT result

Carlisle required 623.4 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 1548 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 248%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Castle Point - HDT result

Castle Point required 821 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 395 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 48%.

Consequences

Based on the 2018 HDT measurement, the local planning authority must apply a 20% buffer when calculating Five Year Land Supply, and should prepare an action plan to assess the causes of under-delivery and identify actions to increase delivery in future years.

Central Bedfordshire - HDT result

Central Bedfordshire required 5001 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 5505.9 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 110.%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Charnwood - HDT result

Charnwood required 2343.6 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 2880.7 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 123%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Chelmsford - HDT result

Chelmsford required 2025.1 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 2802 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 138%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Cheltenham - HDT result

Cheltenham required 1311.6 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 1412.2 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 108%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Cherwell - HDT result

Cherwell required 1676.6 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 3914 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 233%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Cheshire East - HDT result

Cheshire East required 3066.6 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 5609.6 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 183%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Cheshire West and Chester - HDT result

Cheshire West and Chester required 1797.9 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 6570 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 365%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Chesterfield - HDT result

Chesterfield required 670.8 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 446 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 66%.

Consequences

Based on the 2018 HDT measurement, the local planning authority must apply a 20% buffer when calculating Five Year Land Supply, and should prepare an action plan to assess the causes of under-delivery and identify actions to increase delivery in future years.

Chichester - HDT result

Chichester required 1303.8 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 1641.3 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 126%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Chiltern - HDT result

Chiltern required 529.3 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 700.7 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 132%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Chorley - HDT result

Chorley required 1338.3 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 1784 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 133%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Christchurch (Christchurch; East Dorset joint plan area) - HDT result

Christchurch (Christchurch; East Dorset joint plan area) required 1527.8 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 1140.9 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 75%.

Consequences

Based on the 2018 HDT measurement, the local planning authority must apply a 20% buffer when calculating Five Year Land Supply, and should prepare an action plan to assess the causes of under-delivery and identify actions to increase delivery in future years.

City of London - HDT result

City of London required 262.4 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 109.8 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 42%.

Consequences

Based on the 2018 HDT measurement, the local planning authority must apply a 20% buffer when calculating Five Year Land Supply, and should prepare an action plan to assess the causes of under-delivery and identify actions to increase delivery in future years.

Colchester - HDT result

Colchester required 2582.5 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 3109.4 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 120%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Copeland - HDT result

Copeland required 167.4 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 405.8 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 242%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Corby - HDT result

Corby required 1184.4 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 1341 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 113.%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Cornwall - HDT result

Cornwall required 6845.6 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 9075.7 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 133%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Cotswold - HDT result

Cotswold required 857.6 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 2299.6 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 268%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

County Durham - HDT result

County Durham required 4031.6 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 4662.6 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 116.%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Coventry - HDT result

Coventry required 3459.4 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 3630 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 105%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Craven - HDT result

Craven required 407.9 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 594 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 146%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Crawley - HDT result

Crawley required 838.1 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 1521 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 181%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Croydon - HDT result

Croydon required 4623.6 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 6989.4 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 151%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Dacorum - HDT result

Dacorum required 1292.7 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 1978.1 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 153%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Darlington - HDT result

Darlington required 572.3 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 1042.6 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 182%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Dartford - HDT result

Dartford required 1754 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 3174 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 181%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Daventry - HDT result

Daventry required 1825.1 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 2011.3 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 110.%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Derby - HDT result

Derby required 1822.2 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 2060 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 113.%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Derbyshire Dales - HDT result

Derbyshire Dales required 646 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 598 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 93%.

Consequences

Based on the 2018 HDT measurement, the local planning authority should prepare an action plan to assess the causes of under-delivery and identify actions to increase delivery in future years.

Doncaster - HDT result

Doncaster required 1764.1 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 3419 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 194%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Dover - HDT result

Dover required 1265.5 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 1657.4 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 131%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Dudley - HDT result

Dudley required 1810.5 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 1836.1 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 101%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Ealing - HDT result

Ealing required 3161.7 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 3426.9 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 108%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

East Cambridgeshire - HDT result

East Cambridgeshire required 1380.4 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 722 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 52%.

Consequences

Based on the 2018 HDT measurement, the local planning authority must apply a 20% buffer when calculating Five Year Land Supply, and should prepare an action plan to assess the causes of under-delivery and identify actions to increase delivery in future years.

East Devon - HDT result

East Devon required 1762.1 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 2631.8 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 149%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

East Dorset (Christchurch; East Dorset jont plan area) - HDT result

East Dorset (Christchurch; East Dorset jont plan area) required 1527.8 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 1140.9 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 75%.

Consequences

Based on the 2018 HDT measurement, the local planning authority must apply a 20% buffer when calculating Five Year Land Supply, and should prepare an action plan to assess the causes of under-delivery and identify actions to increase delivery in future years.

East Hampshire - HDT result

East Hampshire required 1459.5 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 1518 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 104%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

East Hertfordshire - HDT result

East Hertfordshire required 2382.4 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 1801 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 76%.

Consequences

Based on the 2018 HDT measurement, the local planning authority must apply a 20% buffer when calculating Five Year Land Supply, and should prepare an action plan to assess the causes of under-delivery and identify actions to increase delivery in future years.

East Lindsey - HDT result

East Lindsey required 1190.8 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 1139.8 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 96%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

East Northamptonshire - HDT result

East Northamptonshire required 901.8 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 1478 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 164%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

East Riding of Yorkshire - HDT result

East Riding of Yorkshire required 2891.4 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 3306.6 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 114.%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

East Staffordshire - HDT result

East Staffordshire required 1288 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 1718.9 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 133%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Eastbourne - HDT result

Eastbourne required 747.2 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 543 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 73%.

Consequences

Based on the 2018 HDT measurement, the local planning authority must apply a 20% buffer when calculating Five Year Land Supply, and should prepare an action plan to assess the causes of under-delivery and identify actions to increase delivery in future years.

Eastleigh - HDT result

Eastleigh required 1616.8 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 1866 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 115.%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Eden - HDT result

Eden required 322 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 624 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 194%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Elmbridge - HDT result

Elmbridge required 1029.6 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 636.7 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 62%.

Consequences

Based on the 2018 HDT measurement, the local planning authority must apply a 20% buffer when calculating Five Year Land Supply, and should prepare an action plan to assess the causes of under-delivery and identify actions to increase delivery in future years.

Enfield - HDT result

Enfield required 2354.6 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 2003.3 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 85%.

Consequences

Based on the 2018 HDT measurement, the local planning authority should prepare an action plan to assess the causes of under-delivery and identify actions to increase delivery in future years.

Epping Forest - HDT result

Epping Forest required 1982 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 980 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 49%.

Consequences

Based on the 2018 HDT measurement, the local planning authority must apply a 20% buffer when calculating Five Year Land Supply, and should prepare an action plan to assess the causes of under-delivery and identify actions to increase delivery in future years.

Epsom and Ewell - HDT result

Epsom and Ewell required 1177.4 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 667.2 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 57.%.

Consequences

Based on the 2018 HDT measurement, the local planning authority must apply a 20% buffer when calculating Five Year Land Supply, and should prepare an action plan to assess the causes of under-delivery and identify actions to increase delivery in future years.

Erewash - HDT result

Erewash required 1098.4 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 721 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 66%.

Consequences

Based on the 2018 HDT measurement, the local planning authority must apply a 20% buffer when calculating Five Year Land Supply, and should prepare an action plan to assess the causes of under-delivery and identify actions to increase delivery in future years.

Exeter - HDT result

Exeter required 1264.6 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 1823.6 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 144%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Fareham - HDT result

Fareham required 746.2 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 1021 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 137%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Fenland - HDT result

Fenland required 1199.3 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 1159.6 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 97%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Folkestone and Hythe - HDT result

Folkestone and Hythe required 1050 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 1460.9 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 139%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Forest Heath - HDT result

Forest Heath required 942 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 945.3 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 100%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Forest of Dean - HDT result

Forest of Dean required 821.8 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 821.6 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 100%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Fylde - HDT result

Fylde required 740.9 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 1275.7 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 172%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Gateshead - HDT result

Gateshead required 1373.2 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 685.4 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 50%.

Consequences

Based on the 2018 HDT measurement, the local planning authority must apply a 20% buffer when calculating Five Year Land Supply, and should prepare an action plan to assess the causes of under-delivery and identify actions to increase delivery in future years.

Gedling - HDT result

Gedling required 1154.2 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 583.4 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 51%.

Consequences

Based on the 2018 HDT measurement, the local planning authority must apply a 20% buffer when calculating Five Year Land Supply, and should prepare an action plan to assess the causes of under-delivery and identify actions to increase delivery in future years.

Gloucester - HDT result

Gloucester required 1022.6 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 1461.7 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 143%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Gosport - HDT result

Gosport required 510 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 567.2 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 111.%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Gravesham - HDT result

Gravesham required 975 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 622.3 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 64%.

Consequences

Based on the 2018 HDT measurement, the local planning authority must apply a 20% buffer when calculating Five Year Land Supply, and should prepare an action plan to assess the causes of under-delivery and identify actions to increase delivery in future years.

Great Yarmouth - HDT result

Great Yarmouth required 901.8 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 605.9 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 67%.

Consequences

Based on the 2018 HDT measurement, the local planning authority must apply a 20% buffer when calculating Five Year Land Supply, and should prepare an action plan to assess the causes of under-delivery and identify actions to increase delivery in future years.

Greenwich - HDT result

Greenwich required 5565.2 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 5993.1 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 108%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Guildford - HDT result

Guildford required 1585.3 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 1188 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 75%.

Consequences

Based on the 2018 HDT measurement, the local planning authority must apply a 20% buffer when calculating Five Year Land Supply, and should prepare an action plan to assess the causes of under-delivery and identify actions to increase delivery in future years.

Hackney - HDT result

Hackney required 4512.7 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 3709.8 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 82%.

Consequences

Based on the 2018 HDT measurement, the local planning authority must apply a 20% buffer when calculating Five Year Land Supply, and should prepare an action plan to assess the causes of under-delivery and identify actions to increase delivery in future years.

Halton - HDT result

Halton required 830.6 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 1604 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 193%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Hambleton - HDT result

Hambleton required 574.5 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 1318.8 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 230.%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Hammersmith and Fulham - HDT result

Hammersmith and Fulham required 1589.8 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 2998 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 189%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Harborough - HDT result

Harborough required 1121.4 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 1684 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 150%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Haringey - HDT result

Haringey required 4506 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 2148.9 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 48%.

Consequences

Based on the 2018 HDT measurement, the local planning authority must apply a 20% buffer when calculating Five Year Land Supply, and should prepare an action plan to assess the causes of under-delivery and identify actions to increase delivery in future years.

Harlow - HDT result

Harlow required 1008.2 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 846 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 84%.

Consequences

Based on the 2018 HDT measurement, the local planning authority must apply a 20% buffer when calculating Five Year Land Supply, and should prepare an action plan to assess the causes of under-delivery and identify actions to increase delivery in future years.

Harrogate - HDT result

Harrogate required 1056.8 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 1191 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 113.%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Harrow - HDT result

Harrow required 1322.3 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 2308.8 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 175%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Hart - HDT result

Hart required 696.5 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 1939.6 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 278%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Hartlepool - HDT result

Hartlepool required 584.3 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 980.2 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 168%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Hastings - HDT result

Hastings required 600 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 585.2 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 98%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Havant - HDT result

Havant required 1035.8 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 1523 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 147%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Havering - HDT result

Havering required 3510 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 1713.1 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 49%.

Consequences

Based on the 2018 HDT measurement, the local planning authority must apply a 20% buffer when calculating Five Year Land Supply, and should prepare an action plan to assess the causes of under-delivery and identify actions to increase delivery in future years.

Herefordshire, County of - HDT result

Herefordshire, County of required 1987.3 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 1469.9 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 74%.

Consequences

Based on the 2018 HDT measurement, the local planning authority must apply a 20% buffer when calculating Five Year Land Supply, and should prepare an action plan to assess the causes of under-delivery and identify actions to increase delivery in future years.

Hertsmere - HDT result

Hertsmere required 853.6 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 1348.3 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 158%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

High Peak - HDT result

High Peak required 828.6 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 981 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 118%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Hillingdon - HDT result

Hillingdon required 1327.9 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 2417.7 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 182%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Hinckley and Bosworth - HDT result

Hinckley and Bosworth required 1121.5 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 1585 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 141%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Horsham - HDT result

Horsham required 2314.5 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 3266.3 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 141%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Hounslow - HDT result

Hounslow required 2466 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 1926.9 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 78%.

Consequences

Based on the 2018 HDT measurement, the local planning authority must apply a 20% buffer when calculating Five Year Land Supply, and should prepare an action plan to assess the causes of under-delivery and identify actions to increase delivery in future years.

Huntingdonshire - HDT result

Huntingdonshire required 2213.3 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 2038.6 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 92%.

Consequences

Based on the 2018 HDT measurement, the local planning authority should prepare an action plan to assess the causes of under-delivery and identify actions to increase delivery in future years.

Hyndburn - HDT result

Hyndburn required 247.5 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 339 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 137%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Ipswich - HDT result

Ipswich required 1364.3 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 900.2 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 66%.

Consequences

Based on the 2018 HDT measurement, the local planning authority must apply a 20% buffer when calculating Five Year Land Supply, and should prepare an action plan to assess the causes of under-delivery and identify actions to increase delivery in future years.

Isle of Wight - HDT result

Isle of Wight required 1577.4 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 1112.1 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 71%.

Consequences

Based on the 2018 HDT measurement, the local planning authority must apply a 20% buffer when calculating Five Year Land Supply, and should prepare an action plan to assess the causes of under-delivery and identify actions to increase delivery in future years.

Isles of Scilly - HDT result

Isles of Scilly required 0 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 3 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is Not applicable.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Islington - HDT result

Islington required 3705.8 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 2625.1 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 71%.

Consequences

Based on the 2018 HDT measurement, the local planning authority must apply a 20% buffer when calculating Five Year Land Supply, and should prepare an action plan to assess the causes of under-delivery and identify actions to increase delivery in future years.

Kensington and Chelsea - HDT result

Kensington and Chelsea required 704.5 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 967.6 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 137%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Kettering - HDT result

Kettering required 1350.9 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 1748 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 129%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

King's Lynn and West Norfolk - HDT result

King's Lynn and West Norfolk required 1447.3 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 1318.4 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 91%.

Consequences

Based on the 2018 HDT measurement, the local planning authority should prepare an action plan to assess the causes of under-delivery and identify actions to increase delivery in future years.

Kingston upon Hull, City of - HDT result

Kingston upon Hull, City of required 1523.1 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 2514 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 165%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Kingston upon Thames - HDT result

Kingston upon Thames required 1381.3 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 1042.1 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 75%.

Consequences

Based on the 2018 HDT measurement, the local planning authority must apply a 20% buffer when calculating Five Year Land Supply, and should prepare an action plan to assess the causes of under-delivery and identify actions to increase delivery in future years.

Kirklees - HDT result

Kirklees required 4515.7 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 3398.7 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 75%.

Consequences

Based on the 2018 HDT measurement, the local planning authority must apply a 20% buffer when calculating Five Year Land Supply, and should prepare an action plan to assess the causes of under-delivery and identify actions to increase delivery in future years.

Knowsley - HDT result

Knowsley required 768 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 1394 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 182%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Lambeth - HDT result

Lambeth required 3585 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 4463.6 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 125%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Lancaster - HDT result

Lancaster required 998.3 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 1666 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 167%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Leeds - HDT result

Leeds required 7884.7 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 7581 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 96%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Leicester - HDT result

Leicester required 3587.6 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 4645 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 129%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Lewes - HDT result

Lewes required 1603.4 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 801 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 50%.

Consequences

Based on the 2018 HDT measurement, the local planning authority must apply a 20% buffer when calculating Five Year Land Supply, and should prepare an action plan to assess the causes of under-delivery and identify actions to increase delivery in future years.

Lewisham - HDT result

Lewisham required 4155 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 3942.8 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 95%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Lichfield - HDT result

Lichfield required 1081.8 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 1099 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 102%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Lincoln (Lincoln; North Kesteven; West Lindsey joint plan area) - HDT result

Lincoln (Lincoln; North Kesteven; West Lindsey joint plan area) required 2907.2 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 3244.9 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 112.%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Liverpool - HDT result

Liverpool required 4105.3 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 7931.8 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 193%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

London Legacy Development Corporation - HDT result

London Legacy Development Corporation required 4414.6 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 2290.6 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 52%.

Consequences

Based on the 2018 HDT measurement, the local planning authority must apply a 20% buffer when calculating Five Year Land Supply, and should prepare an action plan to assess the causes of under-delivery and identify actions to increase delivery in future years.

Luton - HDT result

Luton required 1275 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 2273.8 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 178%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Maidstone - HDT result

Maidstone required 2642.3 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 2952 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 112.%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Maldon - HDT result

Maldon required 678.3 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 682.2 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 101%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Malvern Hills (Worcester; Malvern Hills; Wychavon joint plan area) - HDT result

Malvern Hills (Worcester; Malvern Hills; Wychavon joint plan area) required 2768.6 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 5166 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 187%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Manchester - HDT result

Manchester required 6710.1 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 6481.6 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 97%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Mansfield - HDT result

Mansfield required 764.5 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 860 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 112.%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Medway - HDT result

Medway required 3997.1 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 1883.3 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 47%.

Consequences

Based on the 2018 HDT measurement, the local planning authority must apply a 20% buffer when calculating Five Year Land Supply, and should prepare an action plan to assess the causes of under-delivery and identify actions to increase delivery in future years.

Melton - HDT result

Melton required 510 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 426 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 84%.

Consequences

Based on the 2018 HDT measurement, the local planning authority must apply a 20% buffer when calculating Five Year Land Supply, and should prepare an action plan to assess the causes of under-delivery and identify actions to increase delivery in future years.

Mendip - HDT result

Mendip required 1256.7 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 1561 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 124%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Merton - HDT result

Merton required 1116.3 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 1608.9 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 144%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Mid Devon - HDT result

Mid Devon required 897 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 1210.3 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 135%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Mid Suffolk - HDT result

Mid Suffolk required 1273.8 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 1035 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 81%.

Consequences

Based on the 2018 HDT measurement, the local planning authority must apply a 20% buffer when calculating Five Year Land Supply, and should prepare an action plan to assess the causes of under-delivery and identify actions to increase delivery in future years.

Mid Sussex - HDT result

Mid Sussex required 2318.8 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 2554.8 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 110.%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Middlesbrough - HDT result

Middlesbrough required 737.5 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 1705 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 231%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Milton Keynes - HDT result

Milton Keynes required 4587.4 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 3908 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 85%.

Consequences

Based on the 2018 HDT measurement, the local planning authority should prepare an action plan to assess the causes of under-delivery and identify actions to increase delivery in future years.

Mole Valley - HDT result

Mole Valley required 1029.9 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 787.9 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 77%.

Consequences

Based on the 2018 HDT measurement, the local planning authority must apply a 20% buffer when calculating Five Year Land Supply, and should prepare an action plan to assess the causes of under-delivery and identify actions to increase delivery in future years.

New Forest - HDT result

New Forest required 2143.5 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 755 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 35%.

Consequences

Based on the 2018 HDT measurement, the local planning authority must apply a 20% buffer when calculating Five Year Land Supply, and should prepare an action plan to assess the causes of under-delivery and identify actions to increase delivery in future years.

Newark and Sherwood - HDT result

Newark and Sherwood required 1233.6 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 1457 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 118%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Newcastle upon Tyne - HDT result

Newcastle upon Tyne required 2454.6 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 5988 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 244%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Newcastle-under-Lyme - HDT result

Newcastle-under-Lyme required 821.1 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 818.5 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 100%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Newham - HDT result

Newham required 6903.9 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 4918.6 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 71%.

Consequences

Based on the 2018 HDT measurement, the local planning authority must apply a 20% buffer when calculating Five Year Land Supply, and should prepare an action plan to assess the causes of under-delivery and identify actions to increase delivery in future years.

North Devon (North Devon; Torridge joint plan area) - HDT result

North Devon (North Devon; Torridge joint plan area) required 1844.1 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 2363 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 128%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

North Dorset - HDT result

North Dorset required 638.4 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 521 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 82%.

Consequences

Based on the 2018 HDT measurement, the local planning authority must apply a 20% buffer when calculating Five Year Land Supply, and should prepare an action plan to assess the causes of under-delivery and identify actions to increase delivery in future years.

North East Derbyshire - HDT result

North East Derbyshire required 735.2 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 1144 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 156%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

North East Lincolnshire - HDT result

North East Lincolnshire required 713.4 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 819 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 115.%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

North Hertfordshire - HDT result

North Hertfordshire required 2110.6 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 1161 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 55.%.

Consequences

Based on the 2018 HDT measurement, the local planning authority must apply a 20% buffer when calculating Five Year Land Supply, and should prepare an action plan to assess the causes of under-delivery and identify actions to increase delivery in future years.

North Kesteven (Lincoln; North Kesteven; West Lindsey joint plan area) - HDT result

North Kesteven (Lincoln; North Kesteven; West Lindsey joint plan area) required 2907.2 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 3244.9 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 112.%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

North Lincolnshire - HDT result

North Lincolnshire required 1417.7 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 1037 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 73%.

Consequences

Based on the 2018 HDT measurement, the local planning authority must apply a 20% buffer when calculating Five Year Land Supply, and should prepare an action plan to assess the causes of under-delivery and identify actions to increase delivery in future years.

North Norfolk - HDT result

North Norfolk required 1173.5 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 1481.9 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 126%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

North Somerset - HDT result

North Somerset required 3120.7 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 2284 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 73%.

Consequences

Based on the 2018 HDT measurement, the local planning authority must apply a 20% buffer when calculating Five Year Land Supply, and should prepare an action plan to assess the causes of under-delivery and identify actions to increase delivery in future years.

North Tyneside - HDT result

North Tyneside required 2019.9 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 2415.2 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 120%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

North Warwickshire - HDT result

North Warwickshire required 568.4 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 761 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 134%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

North West Leicestershire - HDT result

North West Leicestershire required 843.3 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 2664 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 316%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Northampton - HDT result

Northampton required 1741.9 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 2611.2 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 150%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Northumberland - HDT result

Northumberland required 1981.4 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 3894 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 197%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Norwich (Broadland; Norwich; South Norfolk joint plan area) - HDT result

Norwich (Broadland; Norwich; South Norfolk joint plan area) required 5002.7 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 6657.6 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 133%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Nottingham - HDT result

Nottingham required 2640 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 3314 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 126%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Nuneaton and Bedworth - HDT result

Nuneaton and Bedworth required 1274.3 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 1342.3 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 105%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Oadby and Wigston - HDT result

Oadby and Wigston required 225.4 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 399 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 177%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Oldham - HDT result

Oldham required 1394.4 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 899 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 64%.

Consequences

Based on the 2018 HDT measurement, the local planning authority must apply a 20% buffer when calculating Five Year Land Supply, and should prepare an action plan to assess the causes of under-delivery and identify actions to increase delivery in future years.

Oxford - HDT result

Oxford required 1265.5 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 1247 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 99%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Pendle - HDT result

Pendle required 603.4 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 441.1 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 73%.

Consequences

Based on the 2018 HDT measurement, the local planning authority must apply a 20% buffer when calculating Five Year Land Supply, and should prepare an action plan to assess the causes of under-delivery and identify actions to increase delivery in future years.

Peterborough - HDT result

Peterborough required 3102 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 2827 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 91%.

Consequences

Based on the 2018 HDT measurement, the local planning authority should prepare an action plan to assess the causes of under-delivery and identify actions to increase delivery in future years.

Plymouth - HDT result

Plymouth required 1513.5 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 3058.2 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 202%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Poole - HDT result

Poole required 1871.9 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 1276 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 68%.

Consequences

Based on the 2018 HDT measurement, the local planning authority must apply a 20% buffer when calculating Five Year Land Supply, and should prepare an action plan to assess the causes of under-delivery and identify actions to increase delivery in future years.

Portsmouth - HDT result

Portsmouth required 1856 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 2260.3 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 122%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Preston - HDT result

Preston required 804.5 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 2026 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 252%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Purbeck - HDT result

Purbeck required 336.9 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 445 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 132%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Reading - HDT result

Reading required 1447.4 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 2392.5 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 165%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Redbridge - HDT result

Redbridge required 3370.4 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 1293.8 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 38%.

Consequences

Based on the 2018 HDT measurement, the local planning authority must apply a 20% buffer when calculating Five Year Land Supply, and should prepare an action plan to assess the causes of under-delivery and identify actions to increase delivery in future years.

Redcar and Cleveland - HDT result

Redcar and Cleveland required 427.5 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 1248.2 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 292%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Redditch - HDT result

Redditch required 36.6 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 748 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 2046%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Reigate and Banstead - HDT result

Reigate and Banstead required 1380 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 1646.3 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 119%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Ribble Valley - HDT result

Ribble Valley required 418.8 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 1090 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 260%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Richmond upon Thames - HDT result

Richmond upon Thames required 945 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 1331.7 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 141%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Richmondshire - HDT result

Richmondshire required 159 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 652 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 410.%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Rochdale - HDT result

Rochdale required 1345.6 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 1422 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 106%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Rochford - HDT result

Rochford required 764.3 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 574 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 75%.

Consequences

Based on the 2018 HDT measurement, the local planning authority must apply a 20% buffer when calculating Five Year Land Supply, and should prepare an action plan to assess the causes of under-delivery and identify actions to increase delivery in future years.

Rossendale - HDT result

Rossendale required 622.4 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 465.9 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 75%.

Consequences

Based on the 2018 HDT measurement, the local planning authority must apply a 20% buffer when calculating Five Year Land Supply, and should prepare an action plan to assess the causes of under-delivery and identify actions to increase delivery in future years.

Rother - HDT result

Rother required 1007.9 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 697.2 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 69%.

Consequences

Based on the 2018 HDT measurement, the local planning authority must apply a 20% buffer when calculating Five Year Land Supply, and should prepare an action plan to assess the causes of under-delivery and identify actions to increase delivery in future years.

Rotherham - HDT result

Rotherham required 1814.5 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 1662 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 92%.

Consequences

Based on the 2018 HDT measurement, the local planning authority should prepare an action plan to assess the causes of under-delivery and identify actions to increase delivery in future years.

Rugby - HDT result

Rugby required 1393.5 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 1498.6 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 108%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Runnymede - HDT result

Runnymede required 1196.5 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 1390.4 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 116.%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Rushcliffe - HDT result

Rushcliffe required 1345.8 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 1605.8 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 119%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Rushmoor - HDT result

Rushmoor required 799.6 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 987 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 123%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Rutland - HDT result

Rutland required 318.8 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 728 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 228.%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Ryedale - HDT result

Ryedale required 404.5 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 777 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 192%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Salford - HDT result

Salford required 3730.1 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 5050.7 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 135%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Sandwell - HDT result

Sandwell required 3509.1 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 2137.2 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 61%.

Consequences

Based on the 2018 HDT measurement, the local planning authority must apply a 20% buffer when calculating Five Year Land Supply, and should prepare an action plan to assess the causes of under-delivery and identify actions to increase delivery in future years.

Scarborough - HDT result

Scarborough required 508.7 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 1225 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 241%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Sedgemoor - HDT result

Sedgemoor required 1598.2 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 1622.9 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 102%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Sefton - HDT result

Sefton required 1564.4 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 994.9 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 64%.

Consequences

Based on the 2018 HDT measurement, the local planning authority must apply a 20% buffer when calculating Five Year Land Supply, and should prepare an action plan to assess the causes of under-delivery and identify actions to increase delivery in future years.

Selby - HDT result

Selby required 1046.2 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 1615.2 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 154%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Sevenoaks - HDT result

Sevenoaks required 1204.5 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 1130 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 94%.

Consequences

Based on the 2018 HDT measurement, the local planning authority should prepare an action plan to assess the causes of under-delivery and identify actions to increase delivery in future years.

Sheffield - HDT result

Sheffield required 5564.6 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 6140 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 110.%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Shropshire - HDT result

Shropshire required 3039.4 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 5188 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 171%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Slough - HDT result

Slough required 2522.1 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 2159 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 86%.

Consequences

Based on the 2018 HDT measurement, the local planning authority should prepare an action plan to assess the causes of under-delivery and identify actions to increase delivery in future years.

Solihull - HDT result

Solihull required 1849.2 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 2009.3 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 109.%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

South Bucks - HDT result

South Bucks required 773 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 953.2 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 123%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

South Cambridgeshire - HDT result

South Cambridgeshire required 2577.2 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 2000 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 78%.

Consequences

Based on the 2018 HDT measurement, the local planning authority must apply a 20% buffer when calculating Five Year Land Supply, and should prepare an action plan to assess the causes of under-delivery and identify actions to increase delivery in future years.

South Derbyshire - HDT result

South Derbyshire required 2047.6 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 2343.3 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 114.%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

South Gloucestershire - HDT result

South Gloucestershire required 3319.2 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 4336 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 131%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

South Hams - HDT result

South Hams required 662.7 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 1265 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 191%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

South Holland - HDT result

South Holland required 1208.8 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 855 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 71%.

Consequences

Based on the 2018 HDT measurement, the local planning authority must apply a 20% buffer when calculating Five Year Land Supply, and should prepare an action plan to assess the causes of under-delivery and identify actions to increase delivery in future years.

South Kesteven - HDT result

South Kesteven required 1746 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 1421 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 81%.

Consequences

Based on the 2018 HDT measurement, the local planning authority must apply a 20% buffer when calculating Five Year Land Supply, and should prepare an action plan to assess the causes of under-delivery and identify actions to increase delivery in future years.

South Lakeland - HDT result

South Lakeland required 547.3 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 983.3 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 180%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

South Norfolk (Broadland; Norwich; South Norfolk joint plan area) - HDT result

South Norfolk (Broadland; Norwich; South Norfolk joint plan area) required 5002.7 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 6657.6 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 133%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

South Northamptonshire - HDT result

South Northamptonshire required 1661.1 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 1978 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 119%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

South Oxfordshire - HDT result

South Oxfordshire required 1253.2 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 2245.6 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 179%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

South Ribble - HDT result

South Ribble required 779.4 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 979 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 126%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

South Somerset - HDT result

South Somerset required 1769.7 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 1846 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 104%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

South Staffordshire - HDT result

South Staffordshire required 551.6 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 702 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 127%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

South Tyneside - HDT result

South Tyneside required 1084.6 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 1143.2 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 105%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Southampton - HDT result

Southampton required 2381.1 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 2869 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 120%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Southend-on-Sea - HDT result

Southend-on-Sea required 2494.9 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 1223 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 49%.

Consequences

Based on the 2018 HDT measurement, the local planning authority must apply a 20% buffer when calculating Five Year Land Supply, and should prepare an action plan to assess the causes of under-delivery and identify actions to increase delivery in future years.

Southwark - HDT result

Southwark required 5941.4 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 4770.9 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 80%.

Consequences

Based on the 2018 HDT measurement, the local planning authority must apply a 20% buffer when calculating Five Year Land Supply, and should prepare an action plan to assess the causes of under-delivery and identify actions to increase delivery in future years.

Spelthorne - HDT result

Spelthorne required 1393.6 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 875.6 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 63%.

Consequences

Based on the 2018 HDT measurement, the local planning authority must apply a 20% buffer when calculating Five Year Land Supply, and should prepare an action plan to assess the causes of under-delivery and identify actions to increase delivery in future years.

St Albans - HDT result

St Albans required 1987.1 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 1154.9 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 58.%.

Consequences

Based on the 2018 HDT measurement, the local planning authority must apply a 20% buffer when calculating Five Year Land Supply, and should prepare an action plan to assess the causes of under-delivery and identify actions to increase delivery in future years.

St Edmundsbury - HDT result

St Edmundsbury required 1050.9 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 1108.8 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 106%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

St. Helens - HDT result

St. Helens required 1504.1 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 1473.3 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 98%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Stafford - HDT result

Stafford required 1143.3 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 2561 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 224.%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Staffordshire Moorlands - HDT result

Staffordshire Moorlands required 544.4 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 349 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 64%.

Consequences

Based on the 2018 HDT measurement, the local planning authority must apply a 20% buffer when calculating Five Year Land Supply, and should prepare an action plan to assess the causes of under-delivery and identify actions to increase delivery in future years.

Stevenage - HDT result

Stevenage required 1115.1 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 1118.6 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 100%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Stockport - HDT result

Stockport required 2279.6 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 1721 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 75%.

Consequences

Based on the 2018 HDT measurement, the local planning authority must apply a 20% buffer when calculating Five Year Land Supply, and should prepare an action plan to assess the causes of under-delivery and identify actions to increase delivery in future years.

Stockton-on-Tees - HDT result

Stockton-on-Tees required 1654.2 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 2058 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 124%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Stoke-on-Trent - HDT result

Stoke-on-Trent required 1366.4 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 1959.8 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 143%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Stratford-on-Avon - HDT result

Stratford-on-Avon required 1402 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 3654.7 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 261%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Stroud - HDT result

Stroud required 1374.2 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 1287.4 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 94%.

Consequences

Based on the 2018 HDT measurement, the local planning authority should prepare an action plan to assess the causes of under-delivery and identify actions to increase delivery in future years.

Suffolk Coastal - HDT result

Suffolk Coastal required 1322.3 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 1696 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 128%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Sunderland - HDT result

Sunderland required 1553 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 2893.6 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 186%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Surrey Heath - HDT result

Surrey Heath required 635.3 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 804.2 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 127%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Sutton - HDT result

Sutton required 1217 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 1808.8 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 149%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Swale - HDT result

Swale required 2328 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 1721.2 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 74%.

Consequences

Based on the 2018 HDT measurement, the local planning authority must apply a 20% buffer when calculating Five Year Land Supply, and should prepare an action plan to assess the causes of under-delivery and identify actions to increase delivery in future years.

Swindon - HDT result

Swindon required 3252.5 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 3942.2 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 121%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Tameside - HDT result

Tameside required 2195.8 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 1454.8 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 66%.

Consequences

Based on the 2018 HDT measurement, the local planning authority must apply a 20% buffer when calculating Five Year Land Supply, and should prepare an action plan to assess the causes of under-delivery and identify actions to increase delivery in future years.

Tamworth - HDT result

Tamworth required 440.3 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 377 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 86%.

Consequences

Based on the 2018 HDT measurement, the local planning authority should prepare an action plan to assess the causes of under-delivery and identify actions to increase delivery in future years.

Tandridge - HDT result

Tandridge required 1317.1 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 856.3 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 65%.

Consequences

Based on the 2018 HDT measurement, the local planning authority must apply a 20% buffer when calculating Five Year Land Supply, and should prepare an action plan to assess the causes of under-delivery and identify actions to increase delivery in future years.

Taunton Deane - HDT result

Taunton Deane required 1449.6 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 2766.4 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 191%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Teignbridge - HDT result

Teignbridge required 1513.3 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 2040 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 135%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Telford and Wrekin - HDT result

Telford and Wrekin required 1407.6 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 3524.3 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 250%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Tendring - HDT result

Tendring required 1877 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 1468 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 78%.

Consequences

Based on the 2018 HDT measurement, the local planning authority must apply a 20% buffer when calculating Five Year Land Supply, and should prepare an action plan to assess the causes of under-delivery and identify actions to increase delivery in future years.

Test Valley - HDT result

Test Valley required 1045.7 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 2767.4 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 265%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Tewkesbury - HDT result

Tewkesbury required 1268.6 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 2298 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 181%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Thanet - HDT result

Thanet required 2203.8 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 977 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 44%.

Consequences

Based on the 2018 HDT measurement, the local planning authority must apply a 20% buffer when calculating Five Year Land Supply, and should prepare an action plan to assess the causes of under-delivery and identify actions to increase delivery in future years.

Three Rivers - HDT result

Three Rivers required 932.5 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 624 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 67%.

Consequences

Based on the 2018 HDT measurement, the local planning authority must apply a 20% buffer when calculating Five Year Land Supply, and should prepare an action plan to assess the causes of under-delivery and identify actions to increase delivery in future years.

Thurrock - HDT result

Thurrock required 2480.2 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 2171 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 88%.

Consequences

Based on the 2018 HDT measurement, the local planning authority should prepare an action plan to assess the causes of under-delivery and identify actions to increase delivery in future years.

Tonbridge and Malling - HDT result

Tonbridge and Malling required 1874.7 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 2906 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 155%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Torbay - HDT result

Torbay required 1270.1 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 1148 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 90%.

Consequences

Based on the 2018 HDT measurement, the local planning authority should prepare an action plan to assess the causes of under-delivery and identify actions to increase delivery in future years.

Torridge (North Devon; Torridge joint plan area) - HDT result

Torridge (North Devon; Torridge joint plan area) required 1844.1 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 2363 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 128%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Tower Hamlets - HDT result

Tower Hamlets required 9347.7 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 9393.3 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 100%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Trafford - HDT result

Trafford required 2600.5 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 1224.6 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 47%.

Consequences

Based on the 2018 HDT measurement, the local planning authority must apply a 20% buffer when calculating Five Year Land Supply, and should prepare an action plan to assess the causes of under-delivery and identify actions to increase delivery in future years.

Tunbridge Wells - HDT result

Tunbridge Wells required 1656 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 1457.1 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 88%.

Consequences

Based on the 2018 HDT measurement, the local planning authority should prepare an action plan to assess the causes of under-delivery and identify actions to increase delivery in future years.

Uttlesford - HDT result

Uttlesford required 1532.6 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 2246 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 147%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Vale of White Horse - HDT result

Vale of White Horse required 1304.8 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 4357.1 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 334%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Wakefield - HDT result

Wakefield required 2993.9 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 5496 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 184%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Walsall - HDT result

Walsall required 2140.1 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 2129 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 99%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Waltham Forest - HDT result

Waltham Forest required 2390.7 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 2914.4 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 122%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Wandsworth - HDT result

Wandsworth required 4359 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 7331.7 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 168%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Warrington - HDT result

Warrington required 2616.7 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 1446 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 55.%.

Consequences

Based on the 2018 HDT measurement, the local planning authority must apply a 20% buffer when calculating Five Year Land Supply, and should prepare an action plan to assess the causes of under-delivery and identify actions to increase delivery in future years.

Warwick - HDT result

Warwick required 1999.2 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 2633.5 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 132%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Watford - HDT result

Watford required 833.1 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 903 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 108%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Waveney - HDT result

Waveney required 924.6 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 669 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 72%.

Consequences

Based on the 2018 HDT measurement, the local planning authority must apply a 20% buffer when calculating Five Year Land Supply, and should prepare an action plan to assess the causes of under-delivery and identify actions to increase delivery in future years.

Waverley - HDT result

Waverley required 1575 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 1239.6 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 79%.

Consequences

Based on the 2018 HDT measurement, the local planning authority must apply a 20% buffer when calculating Five Year Land Supply, and should prepare an action plan to assess the causes of under-delivery and identify actions to increase delivery in future years.

Wealden - HDT result

Wealden required 1400.1 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 1569.3 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 112.%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Wellingborough - HDT result

Wellingborough required 865 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 901 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 104%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Welwyn Hatfield - HDT result

Welwyn Hatfield required 1701.4 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 1492.6 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 88%.

Consequences

Based on the 2018 HDT measurement, the local planning authority should prepare an action plan to assess the causes of under-delivery and identify actions to increase delivery in future years.

West Berkshire - HDT result

West Berkshire required 1443.6 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 1682.7 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 117%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

West Devon - HDT result

West Devon required 741.4 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 509.9 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 69%.

Consequences

Based on the 2018 HDT measurement, the local planning authority must apply a 20% buffer when calculating Five Year Land Supply, and should prepare an action plan to assess the causes of under-delivery and identify actions to increase delivery in future years.

West Dorset (West Dorset; Weymouth & Portland joint plan area) - HDT result

West Dorset (West Dorset; Weymouth & Portland joint plan area) required 1610.6 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 2076 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 129%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

West Lancashire - HDT result

West Lancashire required 514.6 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 922.2 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 179%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

West Lindsey (Lincoln; North Kesteven; West Lindsey joint plan area) - HDT result

West Lindsey (Lincoln; North Kesteven; West Lindsey joint plan area) required 2907.2 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 3244.9 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 112.%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

West Oxfordshire - HDT result

West Oxfordshire required 1278.9 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 1313 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 103%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

West Somerset - HDT result

West Somerset required 257.5 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 334 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 130%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Westminster - HDT result

Westminster required 2723.9 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 3151.6 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 116.%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Weymouth & Portland (West Dorset; Weymouth & Portland joing plan area) - HDT result

Weymouth & Portland (West Dorset; Weymouth & Portland joing plan area) required 1610.6 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 2076 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 129%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Wigan - HDT result

Wigan required 2897.7 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 2404 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 83%.

Consequences

Based on the 2018 HDT measurement, the local planning authority must apply a 20% buffer when calculating Five Year Land Supply, and should prepare an action plan to assess the causes of under-delivery and identify actions to increase delivery in future years.

Wiltshire - HDT result

Wiltshire required 5095.7 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 7107.3 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 139%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Winchester - HDT result

Winchester required 1382.4 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 1677.7 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 121%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Windsor and Maidenhead - HDT result

Windsor and Maidenhead required 1845 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 1796 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 97%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Wirral - HDT result

Wirral required 2093.3 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 1530 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 73%.

Consequences

Based on the 2018 HDT measurement, the local planning authority must apply a 20% buffer when calculating Five Year Land Supply, and should prepare an action plan to assess the causes of under-delivery and identify actions to increase delivery in future years.

Woking - HDT result

Woking required 709.1 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 1083.3 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 153%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Wokingham - HDT result

Wokingham required 2012.9 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 3170 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 157%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Wolverhampton - HDT result

Wolverhampton required 1779.9 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 1973.8 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 111.%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Worcester (Worcester; Malvern Hills; Wychavon joint plan area) - HDT result

Worcester (Worcester; Malvern Hills; Wychavon joint plan area) required 2768.6 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 5166 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 187%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Worthing - HDT result

Worthing required 1420.4 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 1316 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 93%.

Consequences

Based on the 2018 HDT measurement, the local planning authority should prepare an action plan to assess the causes of under-delivery and identify actions to increase delivery in future years.

Wychavon (Worcester; Malvern Hills; Wychavon joint plan area) - HDT result

Wychavon (Worcester; Malvern Hills; Wychavon joint plan area) required 2768.6 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 5166 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 187%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Wycombe - HDT result

Wycombe required 1752.4 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 1875.6 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 107%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Wyre - HDT result

Wyre required 822.3 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 1199.6 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 146%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

Wyre Forest - HDT result

Wyre Forest required 580.9 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 672.6 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 116.%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.

York - HDT result

York required 2361.3 new dwellings in the three-year period 2015 to 2018. During this period, the area delivered 2400 new homes. The local planning authority's 2018 Housing Delivery Test Measurement is 102%.

Consequences

Based on the 2018 HDT measurement, the local planning authority faces no sanctions.





Comments

Popular posts from this blog

Just how big is an infill site? Appeal decision: Chinnor, Oxfordshire

An appeal decision initially caught my eye due to its surprising interpretation of 'infill development' -  but also raises some concerning issues around how Neighbourhood Plan policies are applied during the decision-making process.

The appeal relates to an application for the construction of up to 140 dwellings, new public open space, associated landscaping and site infrastructure on a 3.9ha site at Chinnor, Oxfordshire. The application was made by Persimmon Homes and initially refused by South Oxfordshire District Council. The appeal was allowed, meaning the Planning Inspector went against the district council's decision grant planning permission for the scheme. Details of the appeal can be found using the following reference APP/Q3115/W/17/3187058. Neighbourhood Plan & Development Plan Chinnor is a large village in Oxfordshire. The Chinnor Neighbourhood Plan (CNP) was 'made' in October 2017. When the appeal commenced, the Neighbourhood Plan was less than one…

Why the Middlewich Neighbourhood Plan failed

News that the Middlewich Neighbourhood Plan was rejected at referendum has spread rapidly across social media and has even been picked up by local and national press - see BBC article.

The story has garnered a lot of attention as it is highly unusual for a Neighbourhood Plan to be rejected. The Middlewich Neighbourhood Plan is only the third Neighbourhood Plan not to be supported by residents.

At the referendum held on 14 March 2019, the Neighbourhood Plan was rejected, albeit by a very slim margin of just 22 votes.
'No' Campaign Prior to the referendum, Labour town councillors led a campaign which encouraged local people to vote against the Neighbourhood Plan. 
Based on the literature shared by the campaign group, opposition to the Middlewich Neighbourhood Plan appears to be pointed at three key issues: Impacts on the town and its infrastructure of the overall scale of growth Middlewich is expected deliverDisagreement with the individual sites identified by the Neighbourhood …

Neighbourhood Plan Review: Plans made in July 2019

Neighbourhood Plans provide a bespoke planning framework for the local area. No two plans are alike, although many have similar characteristics and address common themes. This post provides a short summary of those Neighbourhood Plans which successfully passed referendum in July 2019, highlighting the elements which make each plan locally specific and unique.

The purpose of this post is to celebrate the achievement of those communities in successfully preparing their Neighbourhood Plans, and to share the interesting ideas and policies for the benefit of others who are currently writing their plans. Links to the Neighbourhood Plans are provided throughout the post.
Navigate this post using the map July was a busy month, with a whopping 24 Neighbourhood Plans successfully passing referendum. To  make it easier to navigate this post, the location of the areas covered by each new Neighbourhood Plan are shown on the interactive map. Click on a marker to reveal a link to the plan's su…

Appeal granted in countryside despite Five Year Land Supply - Shinfield Neighbourhood Plan

Through a recent appeal decision, a Planning Inspector has granted outline planning permission for up to 55 dwellings and 'Suitable Alternative Natural Greenspace' (SANG) at land at Parklands, east of Basingstoke Road, Spencers Wood, Wokingham.

The decision was issued on 28th February 2019, under appeal reference APP/X0360/W/18/3204133.

The appeal site is located between two villages, Three Mile Cross and Spencers Wood. The scheme proposes two areas of development adjoining each of the villages, separated by an area of open space - a 'SANG'.
Shinfield Neighbourhood Plan The Shinfield Neighbourhood Plan (SNP) was made in February 2017. Policy 1 of the SNP addresses the location of development:

In Shinfield Parish, development within the Development Limits..., will be supported; development adjacent to the Development Limits will only be supported where the benefits of the development outweigh its adverse impacts. 

'Development limits' are a very common planning …

Latest stats show continued increase in house-building

Chart: All Things Neighbourhood Planning
Data source: Live tables on housebuilding: new build dwellings (Table 209), MHCLG

The Ministry for Housing, Communities and Local Government has today published its latest data on house building in the United Kingdom. The graph shows the number of dwellings completed by financial year in England. Data is also available for the other home nations. However, Neighbourhood Planning is a feature of the English planning system only.

In 2017/18, there were more than 160,500 new homes constructed. - the highest rate of development since the financial crisis of 2007-08. As illustrated in the graph, the data shows a steady increase in number of homes built each year since the low-point of 2012-13, where less than 108,000 homes were built. 

The rate of development in 2017/18 is comparable to the period 2004 - 2006. Assuming this trend of increasing development rates continues into the current financial year, the number of homes constructed in 2018/19 could po…

Essential reading for Neighbourhood Planners

Through my site neighbourhood-planning.co.uk I have attempted to explain the neighbourhood planning process, and provide regular blog posts on the latest issues affecting neighbourhood planning. But where can you go to find out more?

In this article I attempt to summarise where you should go for the most useful information and guidance, and where you can find funding and support for writing a Neighbourhood Plan.
Locality Toolkits and Guidance Locality administer the government's current programme of support for neighbourhood planning groups, and Locality's neighbourhoodplanning.org site should be your first port of call when writing a Neighbourhood Plan.
Locality has produced an excellent series of 'toolkits & guidance' on a range of issues to assist the preparation of neighbourhood plans. It is difficult to understate how valuable Locality's guides are for budding neighbourhood planners. Be sure you don't miss: The Neighbourhood Plans Roadmap 2018 by Dave …

Putting Health & Wellbeing at the Heart of Neighbourhood Planning

The planning system's origins can be traced back to public health policies from the nineteenth century. Increases in population and the growth of towns created public health problems, and early legislation focused on creating sanitary conditions.

There is a sense that in recent decades planning has lost its way with health, yet our modern environments continue to have profound effects on our health and well-being. In the blog post What stops us from creating healthier places? author Rachel Toms notes that overall, the planning system has done a good job of designing infectious diseases out of the places in which people live, but has "inadvertently contributed to sedentary lifestyles, mental distress and social isolation".

Whilst the planning system has cured the public health problems of the industrial revolution, it faces a new set of public health challenges for the modern era.

In this post, I make the case for prioritising health and wellbeing through Neighbourhood P…

Neighbourhood Planning and Community Health and Wellbeing - Briefing Note for NALC

I have teamed up with the National Association of Local Councils (NALC) to author a briefing note on Neighbourhood Planning and Community Health and Wellbeing.

The briefing note illustrates how Neighbourhood Plans can actively contribute to improving health and wellbeing in their communities, and draws on recent examples of neighbourhood plan policies. Neighbourhood Plans can tackle issues of health and wellbeing in lots of different ways, as explained in the briefing note, and is something I will be making the case for in future blog posts.

A pdf version of the briefing note is available to view and download below. Further advice on neighbourhood planning is also available from NALC's website.




Secretary of State overturns Planning Inspector's decision due to density concerns

Normally, planning appeals are determined by Planning Inspectors, but in some circumstances appeals may be 'recovered' for determination by the Secretary of State (SoS). The current SoS for Housing, Communities and Local Government is James Brokenshire MP.

In December 2018, the SoS issued a decision on a recovered appeal at Woburn Sands, Buckinghamshire. The proposal for residential development of up to 203 dwellings, a doctor’s surgery, open space and landscaping, together with pedestrian, cycle and vehicular access, was initially refused by Milton Keynes Council, and following appeal, granted permission by a Planning Inspector. However, the SoS recovered the appeal and overturned the Inspector's decision, dismissing the appeal.

Details of the case are available on the Planning Inspectorate's website, using case reference: APP/Y0435/W/17/3169314.
Appeal site & Neighbourhood Plan The appeal site is a 15.2 hectare, greenfield site, located outside the development bo…

New Interactive Map of Neighbourhood Plans

ATNP's Interactive Neighbourhood Plan map is a new tool showing locations with a Neighbourhood Plan in force.

The interactive map is free to use and compatible with desktop and mobile devices. It allows the user to pan and zoom across the country to locate areas with Neighbourhood Plans, Neighbourhood Development Orders & Community Right to Build Orders in place. Each marker represents a different plan, and provides a web link to view or download the plan.

This new map builds upon the Neighbourhood Plan Finder which lists Neighbourhood Plans by local planning authority area.

Try the Interactive Neighbourhood Plan Map now

For details of mapping services offered by All Things Neighbourhood Planning, visit the Maps section.